Westmoreland County, VA — Solar Development Risk Assessment

Local solar ordinance barriers, board sentiment, and utility policies that affect development timelines and risk.

36.5
Risk Grade
Good
CUP pathway; Northern Neck rural county; CBPA compliance layer; very limited track record.
Assessment Snapshot
Population
17,454
State Rank
#6
Compliance
45%
Trajectory
50

Moratorium Status

✓ No Active Moratorium
No Moratorium

Ordinance & Regulations

Setback Requirements
Westmoreland County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Westmoreland County zoning ordinance for adopted local setback standards.
Zoning Mechanism
A-1, Agricultural | CUP
Acreage Caps
None codified
Density Caps
None codified.
Spacing Rules
Chesapeake Bay Act buffers apply near waterways.
Size Restrictions
None codified

Board Sentiment & Political Risk

Sentiment Analysis
Cautious/neutral
Basis for Assessment
3-member R BOS; Northern Neck EC territory; small number of approvals; Cardinal News listed county as taking actions to restrict solar 2022–2024
Political Risk Factors
Stable
Board Members
Darryl E. Fisher | R | Nov 2027 (Chairman, District 1) Timothy J. Trivett | R | Nov 2027 (Vice-Chair, District 5) Jeffrey A. McCormack | R | Nov 2027 (District 2) Matthew D. Ingram | R | Nov 2027 (District 3) W. W. Hynson | R | Nov 2027 (District 4) Source: westmoreland-county.org/bos

Grid, Utilities & State Context

Grid Operator
PJM / Dominion Energy Virginia (DEV) transmission zone
Utilities
Northern Neck Electric Co-op (NNEC), Rappahannock Electric Co-op (REC)
State Permitting Process
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
State Incentives
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Development Activity

Active/Completed Projects
Montross Solar (NextEra Energy / Virginia EC) | ~20–40 MW / ~200 acres | SEP Approved | Operational — referenced in VA DEQ decommissioning survey records; Northern Neck Additional approvals | 5–30 MW | 2018–2023 | Northern Neck EC / Dominion territory
Denied/Withdrawn Projects
None confirmed — Montross Solar operational; Northern Neck market; no documented formal rejections