Roanoke County, VA — Solar Development Risk Assessment

Local solar ordinance barriers, board sentiment, and utility policies that affect development timelines and risk.

44
Risk Grade
Good
Suburban Western VA county; limited utility-scale land; SUP/SE pathway; minimal track record.
Assessment Snapshot
Population
94,186
State Rank
#16
Compliance
70%
Trajectory
50

Moratorium Status

✓ No Active Moratorium
No Moratorium

Ordinance & Regulations

Setback Requirements
Roanoke County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Roanoke County zoning ordinance for adopted local setback standards.
Zoning Mechanism
SUP / SE
Acreage Caps
No codified cap (de facto limited by land availability)
Density Caps
No codified cap (de facto limited by land availability)
Spacing Rules
None codified.
Size Restrictions
None codified

Board Sentiment & Political Risk

Sentiment Analysis
Cautious — suburban constraints
Basis for Assessment
R-majority BOS; suburban APCo territory; small solar approvals only; land constraints dominate over political signal
Political Risk Factors
Stable
Board Members
Martha B. Hooker | R | Nov 2027 (Catawba District) Phil North | R | Nov 2027 (Hollins District) David Radford | R | Nov 2027 (Windsor Hills District) Paul Mahoney | R | Nov 2027 (Cave Spring District) Tammy Shepherd | R | Nov 2027 (Vinton District) Source: roanokecountyva.gov/288/Board-of-Supervisors-Members

Grid, Utilities & State Context

Grid Operator
PJM / Dominion Energy Virginia (DEV) transmission zone
Utilities
Appalachian Power (APCo), Dominion Energy Virginia (DEV — eastern portions)
State Permitting Process
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
State Incentives
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Development Activity

Active/Completed Projects
Solar development in Roanoke County (SW Virginia metro). Appalachian Power (APCo) and Dominion Energy serve Roanoke County. Roanoke Valley: active commercial/municipal solar. VCEA mandate driving utility-scale pipeline.
Denied/Withdrawn Projects
No confirmed Board of Supervisors solar CUP/SUP denial on record for Roanoke County as of Mar 2026. Virginia Weldon Cooper Center tracks approval/denial data statewide — verify at coopercenter.org for current Roanoke County project history.