Chesterfield County, VA — Solar Development Risk Assessment

Local solar ordinance barriers, board sentiment, and utility policies that affect development timelines and risk.

52.2
Risk Grade
Fair
Not a typical utility-scale county; pathway is discretionary and land constraints are significant.
Assessment Snapshot
Population
364,556
State Rank
#26
Compliance
70%
Trajectory
50

Moratorium Status

✓ No Active Moratorium
No Moratorium

Ordinance & Regulations

Setback Requirements
Chesterfield County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Chesterfield County zoning ordinance for adopted local setback standards.
Zoning Mechanism
Large Scale Solar Energy Facility regulated via Special Exception under county code (historically tied to electrical generating facilities use category).
Acreage Caps
No countywide acreage or density cap; individual project scale governed by SE/CUP conditions and site plan review on a per-project basis; projects must comply with underlying industrial/agricultural district dimensional standards
Density Caps
None codified.
Spacing Rules
None codified
Size Restrictions
None codified; managed via SUP/site plan

Board Sentiment & Political Risk

Sentiment Analysis
Unclear / suburban constraints
Basis for Assessment
Suburban land use and discretionary SE pathway suggests limited suitability for utility-scale (needs project roster).
Political Risk Factors
Stable
Board Members
James "Jim" Holland | R | Nov 2027 (Chairman, Dale District) Mark S. Miller Ph.D. | R | Nov 2027 (Midlothian District) LeQuan M. Hylton Ph.D. | D | Nov 2027 (Dale District) (5 total members; 3 confirmed) Source: chesterfield.gov/1218/Board-of-Supervisors

Grid, Utilities & State Context

Grid Operator
PJM / Dominion Energy Virginia (DEV) transmission zone
Utilities
Dominion Energy Virginia (DEV), Central Virginia Electric Co-op (CVEC — rural fringes)
State Permitting Process
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
State Incentives
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Development Activity

Active/Completed Projects
Multiple CUP approvals 2018–2024 | 5–50 MW | Dominion territory Dutch Gap Solar (Dominion Energy) | ~20 MW / industrial pockets | CUP Approved 2020 | Operational Clover Hill Solar (unnamed developer) | ~30 MW | CUP Approved 2021 | Operational Suburban Richmond — industrial/agricultural pockets only; suburban expansion limits large parcels
Denied/Withdrawn Projects
No confirmed Board of Supervisors solar CUP/SUP denial on record for Chesterfield County as of Mar 2026. Virginia Weldon Cooper Center tracks approval/denial data statewide — verify at coopercenter.org for current Chesterfield County project history.

Explore the Full Tracker

View risk assessments for all 3,100+ US counties, compare states, and download detailed ordinance data for your solar development pipeline.

Launch SolarRisk Tracker