45.5
Risk Grade
Good
Very large setbacks and BOS discretion (SEP) increase entitlement risk vs. Southside counties with clearer pathways.
Assessment Snapshot
Population
13,145
State Rank
#19
Compliance
70%
Trajectory
50

Moratorium Status

✓ No Active Moratorium
No Moratorium

Ordinance & Regulations

Setback Requirements
Amelia County-specific SE/SUP conditions control — county-set setbacks vary from 50 ft (rural) to 300+ ft (residential adjacent). Verify current Amelia County zoning ordinance for adopted local setback standards.
Zoning Mechanism
Utility-scale solar via Special Exception Permit (SEP) (zoning district applicability per County code).
Acreage Caps
Not codified in the excerpted section; project-specific via SEP.
Density Caps
None codified.
Spacing Rules
None codified
Size Restrictions
None codified; managed via Special Exception

Board Sentiment & Political Risk

Sentiment Analysis
Mixed / rural-protective
Basis for Assessment
Large setback framework and SEP discretion suggest a cautious approach; local discussions around solar rules (not yet fully captured in this row).
Political Risk Factors
Stable
Board Members
David M. Felts Jr. | R | Nov 2027 (Chairman) H. Joseph Easter IV | R | Nov 2027 Morris (District 3) | R | Nov 2027 Jones (District 4) | R | Nov 2027 (5 total members) Source: ameliacova.com/departments/boards_and_commissions/board_of_supervisors.php

Grid, Utilities & State Context

Grid Operator
PJM / Dominion Energy Virginia (DEV) transmission zone
Utilities
Central Virginia Electric Co-op (CVEC), Dominion Energy Virginia (DEV)
State Permitting Process
Local permit: Special Use Permit (SUP) or Conditional Use Permit (CUP) in A-1 Agricultural zoning; issued by Board of Supervisors (BOS) or Planning Commission per county ordinance. Counties without zoning (Buchanan, Russell, Lee, Scott, etc.) proceed via revenue-sharing siting agreements. SCC CPCN: Va. Code §56-580 (as amended by HB 1558/SB 762, eff. Jul 2021) — SCC Certificate of Public Convenience & Necessity required for generating facilities ≥5 MW; waivable for utility-owned projects under SCC-approved IRP. DEQ Permit by Rule (PBR): Required for all solar facilities ≥1 MW per Va. Code §10.1-1197.6; includes VSMP/VPDES erosion & stormwater permits. Mar 2022 DEQ rule: solar panels counted as impervious surface same as parking lots. Revenue sharing: Va. Code §15.2-2288.7 — localities may require up to $1,400/MW-year for utility-scale solar on agricultural or forestal land; increases 10% in year 1 then every 5 years thereafter. VDACS notice: VA Dept. of Agriculture & Consumer Services must be notified for projects converting prime agricultural or forestal land. PENDING LEGISLATION (as of Mar 11, 2026): HB 711 (Herring) / SB 347 (VanValkenburg) both cleared both chambers and await Gov. Spanberger's signature (session ends Mar 14, 2026). If signed: (1) all localities must allow solar ≥1 MW via special exception — outright bans illegal; (2) statewide setback floor: 150–200 ft non-participating dwellings, 50–100 ft from state roads, 100–250 ft from streams/wetlands, 50–75 ft from property lines; (3) localities retain denial authority but must report reasons to SCC public database; (4) companion HB 891/SB 443: BESS permitted accessory use on approved solar SE sites. Spanberger is pro-solar; signature expected. Monitor: lis.virginia.gov.
State Incentives
Virginia Clean Economy Act (VCEA, 2020): Dominion must reach 100% carbon-free by 2045; Appalachian Power by 2050; major driver of utility-scale solar procurement. Net metering: available under VCEA for systems up to 1 MW (by-right); large-scale behind-the-meter negotiated. SCC SolarShare: Dominion program offering renewable energy credits. Virtual net metering (Virginia): programs vary by utility. DEQ review: required for solar facilities ≥150 MW (permit by rule) or DEQ standalone review. Utility: Dominion Energy Virginia serves 2/3 of VA; Appalachian Power (AEP) serves western VA; Northern Virginia Electric Coop (NOVEC) serves NoVA exurbs; various rural cooperatives and municipal utilities.

Development Activity

Active/Completed Projects
Multiple CUP approvals 2020–2024 | 20–100 MW | Dominion territory Amelia Solar (NextEra Energy) | ~80 MW / ~640 acres | CUP Approved 2021 | Operational Chula Solar (Pine Gate Renewables) | ~60 MW / ~480 acres | CUP Approved 2022 | Operational Additional mid-size approvals | 20–60 MW | 2020–2024 | Active pipeline south of Richmond
Denied/Withdrawn Projects
No confirmed Board of Supervisors solar CUP/SUP denial on record for Amelia County as of Mar 2026. Virginia Weldon Cooper Center tracks approval/denial data statewide — verify at coopercenter.org for current Amelia County project history.