52.5
Risk Grade
Fair
Bledsoe scores C primarily due to terrain constraints limiting viable solar land (which raises development difficulty beyond what ordinance alone captures), plateau anti-industrial trajectory in neighboring counties, and minimal planning capacity creating process uncertainty. Low saturation reflects terrain, not welcoming policy.
Assessment Snapshot
Population
14,836
State Rank
#32
Compliance
45%
Trajectory
48

Moratorium Status

✓ No Active Moratorium
No Moratorium

Ordinance & Regulations

Setback Requirements
No county-specific solar setbacks. State minimums apply.
Zoning Mechanism
Bledsoe County Planning Commission (limited capacity): CUP in Agricultural/Rural zoning per SB 2373 (2022); County Commission review required.
Acreage Caps
None codified.
Density Caps
None codified.
Spacing Rules
None codified.
Size Restrictions
None codified.

Board Sentiment & Political Risk

Sentiment Analysis
Very rural Cumberland Plateau community; limited solar development interest to date; terrain significantly constrains viable siting areas; low population reduces organized opposition but also reduces planning capacity
Basis for Assessment
Bledsoe County is one of Tennessee's smallest and most rural plateau counties; limited flat land for large solar installations; forested plateau terrain unsuitable for most utility-scale development; coal heritage in surrounding region creates some cultural skepticism about energy land-use change
Political Risk Factors
Worsening
Board Members
County Mayor Gregg Ridgeway | R | Aug 2026 County Commission (14 members); verify at bledsocountytn.gov

Grid, Utilities & State Context

Grid Operator
TVA (Tennessee Valley Authority)
Utilities
Sequachee Valley Electric Cooperative (TVA distributor), Tennessee Valley Authority (wholesale)
State Permitting Process
County zoning authority under SB 2373 (2022); no state solar preemption; conditional use permit or special exception typically required; decommissioning bond often required; setback standards increasingly codified
State Incentives
Federal ITC eligible; no Tennessee state solar tax credit; TVA Green Power Switch program available

Development Activity

Active/Completed Projects
No confirmed utility-scale solar approvals on record.
Denied/Withdrawn Projects
No confirmed denials.