83.5
Risk Grade
Fail
SB 52 exclusion zone — county commissioners have banned utility-scale solar in all or most unincorporated areas. NW Ohio; Lima area; Allen County confirmed SB 52 exclusion zone; manufacturing heritage (Lima locomotive); ATSI/FirstEnergy
Assessment Snapshot
Population
103,642
State Rank
#27
Compliance
85%
Trajectory
82

Moratorium Status

⚠ Active Moratorium
Active SB 52 Exclusion Zone — county resolution banning utility-scale solar

Ordinance & Regulations

Setback Requirements
OPSB standard applies per OAC 4906-4-09(G)(4): ≥50 ft from parcel boundary; ≥300 ft from non-participating residences; ≥150 ft from road ROW. No additional county-specific setbacks.
Zoning Mechanism
Allen County: sub-50 MW projects governed by county zoning ordinance. ≥50 MW requires OPSB CECPN (see State Permitting Requirements).
Acreage Caps
None codified.
Density Caps
Allen County: exclusion zone active — functional cap of ZERO new utility-scale solar.
Spacing Rules
None codified.
Size Restrictions
None codified.

Board Sentiment & Political Risk

Sentiment Analysis
Hostile — county commissioners among lead opponents of Birch Solar; SB52 ban in place
Basis for Assessment
Birch Solar denial set precedent for 'public interest' opposition-based denials; Birch OH Supreme Court appeal dropped Jan 2025
Political Risk Factors
Worsening
Board Members
Greg Sneary | R | Commissioner | Jay Begg | R | Commissioner | Cory Noonan | R | Commissioner | Board of County Commissioners | 3 members | Lima, Ohio | 4-yr staggered terms | Partisan elections | All-Republican board

Grid, Utilities & State Context

Grid Operator
PJM / FirstEnergy (ATSI — Ohio Edison / Toledo Edison) zone
Utilities
First Energy (Ohio Edison), First Energy (Ohio Edison)
State Permitting Process
Ohio Power Siting Board (OPSB) has jurisdiction for solar ≥50 MW (Ohio Revised Code Chapter 4906). Senate Bill 52 (2021) dramatically altered the siting process: county commissioners gained authority to (1) block individual projects via 90-day review window (must adopt resolution within 90 days of public meeting), and (2) pass blanket 'exclusion zones' restricting all utility-scale solar/wind in unincorporated areas. As of September 2025, 37 Ohio counties have enacted SB 52 exclusion zones affecting at least 1 township. Known full/near-full county bans (as of Mar 2026): Adams, Allen, Auglaize, Brown, Butler, Clark, Clermont, Columbiana, Crawford, Erie, Fairfield, Fayette, Greene, Hancock, Henry, Licking, Logan, Madison, Mahoning, Marion, Medina, Morrow, Ottawa, Putnam, Richland, Seneca, Union, Wayne. Kingwood Solar (175 MW, Greene County) OPSB denial on 'public interest' grounds is before Ohio Supreme Court (oral arguments Mar 13, 2025; decision pending Mar 2026). Projects <50 MW: local zoning governs (HB 501 of 2023 granted local authority over sub-50 MW projects). OPSB certificate preempts local zoning once issued (RC 4906.13(B)); but SB 52 allows county veto before OPSB stage. Priority Investment Areas (PIA): brownfield/former coal mine sites may receive expedited 90-day OPSB review. PJM interconnection required. Most of Ohio served by AEP Ohio, FirstEnergy (ATSI), Duke Energy Ohio (DEOK), or AES Ohio/DP&L.
State Incentives
Ohio has no Renewable Portfolio Standard (HB 6 2019 effectively eliminated compliance mandate). SREC market: Ohio SRECs tradeable but very low value due to lack of mandate (~$2-5/SREC 2024). Net metering: available under Ohio law for ≤120% of customer load; AEP Ohio, FirstEnergy (Ohio Edison, CEI, Toledo Edison), Duke/DP&L, AES Ohio offer standard programs. Solar PILOT (Payment in Lieu of Taxes): county agreements common for large-scale projects. Ohio Enterprise Zone/CRA: potential tax abatement for qualifying sites. SB52 (2021): county commissioners can restrict ≥50 MW solar projects via exclusion zones or individual project veto — key risk factor for development in 37+ Ohio counties.

Development Activity

Active/Completed Projects
No named individual utility-scale project confirmed in Allen County OPSB records as of Mar 2026.
Denied/Withdrawn Projects
Allen County — No SB52 exclusion zone — open to OPSB applications. No confirmed OPSB certificate denials specific to Allen County. County open to OPSB-level applications.