Jersey County, IL — Solar Development Risk Assessment

Local solar ordinance barriers, board sentiment, and utility policies that affect development timelines and risk.

39.5
Risk Grade
Good
Mississippi bluff county; some flat agricultural areas; SUP pathway; limited track record; stable.
Assessment Snapshot
Population
21,183
State Rank
#4
Compliance
45%
Trajectory
50

Moratorium Status

✓ No Active Moratorium
No Moratorium

Ordinance & Regulations

Setback Requirements
State floor applies: ≥50 ft from property line; ≥150 ft from non-participating residence; ≥50 ft from road ROW. No county-specific setbacks above this floor.
Zoning Mechanism
Jersey County: CUP or Special Use Permit in Agricultural (A-1) district.
Acreage Caps
None codified.
Density Caps
None codified.
Spacing Rules
None codified.
Size Restrictions
None codified.

Board Sentiment & Political Risk

Sentiment Analysis
Cautious/neutral — Jerseyville area; near Grafton and scenic Illinois River; limited project history; moderate revenue interest; some visual concern
Basis for Assessment
Jerseyville Solar and Grafton Solar approved 2021–2022; board receptive; no organized opposition; Ameren IL territory; Mississippi River bluff geography limits very large sites
Political Risk Factors
Stable
Board Members
County Board | Gary Krueger | R | Term Expires: 2026; Kenneth Grizzle | NP | Term Expires: 2026; Jarrod Hayes | NP | Term Expires: 2026; Dave Crone | NP | Term Expires: 2026; Marty Ward | NP | Term Expires: 2026; Ed Koenig Jr. | NP | Term Expires: 2026; Ben Heitzig | NP | Term Expires: 2026; Kara Ontis | NP | Term Expires: 2026; Mark Wagner | NP | Term Expires: 2026; Jeremy Beasley | NP | Term Expires: 2026; Jared Mills | NP | Term Expires: 2026; Sheila Beers | NP | Term Expires: 2026

Grid, Utilities & State Context

Grid Operator
MISO / Ameren Illinois Transmission (AIT) zone (verify for projects near MISO/PJM boundary)
Utilities
Ameren Illinois, Western Illinois Electric Co-op
State Permitting Process
Local permit: Special Use Permit (SUP) in A-1 Agricultural zoning via county Zoning Board of Appeals (ZBA) and/or County Board; process and conditions vary by county ordinance. ICC CPCN: Illinois Public Utilities Act §8-406 — Illinois Commerce Commission (ICC) Certificate of Public Convenience & Necessity required for ALL generating facilities >2 MW, regardless of local SUP status; ICC process runs parallel to county SUP. PA 102-1123 (signed Jan 27, 2023): Preempts county ordinances that prohibit wind or solar; sets state minimum setback floor of ≥150 ft from non-participating property lines and ≥300 ft from occupied dwellings. Counties may set higher setbacks but not lower; wind/solar bans enacted before 2023 are invalidated. PA 103-0580 (Veto Session fall 2023): Trailer bill reinforcing PA 102-1123 preemption framework; addressed specific county attempts to circumvent preemption. CEJA 2021 (Climate & Equitable Jobs Act): Illinois RPS targets — 40% by 2030, 50% by 2040, 100% clean energy by 2045; IPA Illinois Shines program administers FEJA/CEJA incentive tranches for community and utility-scale solar.
State Incentives
Illinois Adjustable Block Program (Illinois Shines): 15-year SREC contracts for net-metered and community solar projects; administered by IL SHINES program. Solar for All (SFA): low-income community solar program with enhanced incentives. Illinois RPS: 50% renewable by 2040 (Future Energy Jobs Act); solar carve-out drives strong SREC demand. Net metering: available for ≤2 MW behind-the-meter systems (ComEd, Ameren IL). PACE financing: available in many IL counties. HB 4412 (2024): updated solar siting framework; county commission approval required for projects exceeding acreage thresholds in unincorporated areas. Utility: ComEd serves northern IL (Cook + 10 counties); Ameren Illinois serves central/southern IL; electric cooperatives serve rural downstate areas.

Development Activity

Active/Completed Projects
Hickory Solar (Hecate Energy): 110 MW — OPERATIONAL Dec 2024; Jersey County; Ameren Illinois territory; MISO PJM interface area; approved via ICC CPCN + County Board SUP; landowner lease revenue model; interconnects near Jerseyville substation.
Denied/Withdrawn Projects
No confirmed ICC denial or county board rejection on record for Jersey County. Under PA 102-1123 (eff. Jan 2023) counties CANNOT deny compliant solar applications — making formal denials legally precluded for projects meeting state siting standards. Pre-2023 restrictive actions are now superseded. Source: PA 102-1123; ISACo Issue Brief