Mariposa County, CA — Solar Development Risk Assessment

Local solar ordinance barriers, board sentiment, and utility policies that affect development timelines and risk.

46.2
Risk Grade
Good
Yosemite National Park gateway county with mountainous terrain (elevations 1,500–13,000 ft) severely limiting flat developable land; significant NPS-adjacent sensitivity; Sierra Miwok tribal cultural resources require consultation; very low population density (~12/sq mi); small pipeline; B-grade with B-C characteristics from terrain and environmental sensitivity constraints
Assessment Snapshot
Population
17203
State Rank
#22
Compliance
44%
Trajectory
42

Moratorium Status

✓ No Active Moratorium
No specific moratorium information available.

Ordinance & Regulations

Setback Requirements
200 ft from occupied residences; 100 ft from property lines; viewshed restrictions near scenic corridors
Zoning Mechanism
Conditional Use Permit (CUP); CEQA review; NPS consultation required for projects visible from Yosemite corridor; tribal cultural resource review (Sierra Miwok lands)
Acreage Caps
None specified
Spacing Rules
None specified
Size Restrictions
Projects >500 kW require CUP; viewshed analysis required for projects along Highway 140/120 scenic corridors

Board Sentiment & Political Risk

Sentiment Analysis
Neutral-cautious — Yosemite tourism-dependent economy; concern about industrial development impacting scenic quality; limited organized solar advocacy
Basis for Assessment
County planning records; limited public record on solar-specific hearings
Political Risk Factors
Stable
Board Members
Robin Peters | R | 2026; Kevin Cann | R | 2028; Rosalie Swann | R | 2026; Melissa Foster | R | 2028; Marshall Long | R | 2026

Grid, Utilities & State Context

Grid Operator
CAISO — PG&E Balancing Authority
Utilities
Pacific Gas & Electric (PG&E)
State Permitting Process
County zoning + CEQA review required; CEC siting jurisdiction for projects >50 MW on state/federal land; Coastal Commission review for coastal zone; DRECP DFAs streamline desert county permitting
State Incentives
Federal ITC eligible; California Self-Generation Incentive Program (SGIP) for storage; CA Renewables Portfolio Standard procurement; CPUC approved procurement programs

Development Activity

Active/Completed Projects
Mariposa area small commercial solar; no utility-scale projects on record

Explore the Full Tracker

View risk assessments for all 3,100+ US counties, compare states, and download detailed ordinance data for your solar development pipeline.

Launch SolarRisk Tracker